(As always, please do not share publicly images you will see below)
Wagner base in Tsel
Airbus imagery acquired 03 AUG shows an increased presence of trucks/cars by 930, low bed semi-trailer trucks by 18, decreased presence of semi-trailer trucks by 2, and complete absence of buses compared to imagery acquired 17 JUL.
In addition, 40 shipping containers and minor construction works on a material storage facility were observed.
The number of medium tents decreased by 14, but the number of small tents increased by 15 in the entire camp. One large tent also appeared.
Installed canopies in front of tents, camp beds around the tents, and the number of vehicles suggest the base is probably fully staffed.
Luninets Air Base
Airbus imagery acquired 03 AUG shows 15x transporter erector launchers (TELs) relocated in the newly built central part of the air base and in combat position compared to imagery from 03 JUN.
In addition, an S-300PS battery was deployed in the newly built central part of the air base. Two EW/battle management radars have been connected to the 40V6MR masts and are highly likely at full operational readiness. One 40V6MR mast was probably being deployed to be connected to the existing EW/ battle management radar.
Positions of the S-300PS battery deployed in the eastern part of the air base and the EW/battle management radars from the previously stationed S-400 battery in the western part of the air base remained unchanged.
Work is also nearing completion on an EW/battle management radar platform in the eastern part of the airbase.